Blast rocks, drill tunnels and force your way through every mountain. At the beginning you have enough time and no major problems. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade.
That’s how you’ll create the building site piece by piece before starting the tunnel itself. You’ll need to pay attention to many factors. The tunnel drilling machine has to be kept supplied with building materials. It’s important that you don’t lose track of your tasks. Frequent visits to your control room will be crucial.
20 Comments - Last post 8 seconds ago by sensualshakti
74 Comments - Last post 52 seconds ago by sensualshakti
131 Comments - Last post 32 minutes ago by JMM72
47,309 Comments - Last post 48 minutes ago by FranckCastle
307 Comments - Last post 53 minutes ago by sfkng
1,225 Comments - Last post 1 hour ago by TeDGamer
16,710 Comments - Last post 1 hour ago by DrR0Ck
3,736 Comments - Last post 9 minutes ago by yugimax
766 Comments - Last post 15 minutes ago by yoko666
29,611 Comments - Last post 27 minutes ago by Kingsajz
1,603 Comments - Last post 1 hour ago by Poisonorange
881 Comments - Last post 1 hour ago by C3les
72 Comments - Last post 2 hours ago by makki
11,070 Comments - Last post 3 hours ago by jbondguy007
Thanks! (◕‿◕)
Comment has been collapsed.
Thanks for a chance! ;)
Comment has been collapsed.
Thanks! (◕‿◕✿)
Comment has been collapsed.