Blast rocks, drill tunnels and force your way through every mountain. At the beginning you have enough time and no major problems. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade.
That’s how you’ll create the building site piece by piece before starting the tunnel itself. You’ll need to pay attention to many factors. The tunnel drilling machine has to be kept supplied with building materials. It’s important that you don’t lose track of your tasks. Frequent visits to your control room will be crucial.
1,536 Comments - Last post 48 minutes ago by SerafimGluk
17 Comments - Last post 1 hour ago by pb1
173 Comments - Last post 1 hour ago by ormax3
305 Comments - Last post 2 hours ago by Jogge
18 Comments - Last post 2 hours ago by GeekDoesStuff
29 Comments - Last post 3 hours ago by coleypollockfilet
2,666 Comments - Last post 3 hours ago by Calibr3
5 Comments - Last post 6 minutes ago by Gberry
20 Comments - Last post 6 minutes ago by Golwar
157 Comments - Last post 9 minutes ago by CheMan39
47 Comments - Last post 9 minutes ago by RePlayBe
85 Comments - Last post 26 minutes ago by GeoSol
70 Comments - Last post 28 minutes ago by NoOne127
79 Comments - Last post 35 minutes ago by Swordoffury
Thanks! (◕‿◕)
Comment has been collapsed.
Thanks for a chance! ;)
Comment has been collapsed.
Thanks! (◕‿◕✿)
Comment has been collapsed.